Drexler sibbet team performance model

broken image
broken image

Through this stage, every team member finds out his/her colleagues, their skills and specific roles that they are going to serve during the project. Everybody needs to have in mind the reason behind forming the team and the final goal to which the team is heading to.

broken image

Model Descriptionįirst and foremost, it is of vital importance for the scope of the project to be clarified during the first meeting of the new team. Through steps 5 to 7, they analyze project team sustainability and performance. Steps 1 to 4, describe the number of stages that need to take place in creating a project team. Allan Drexler and David Sibbet suggested a team performance model with seven steps.

broken image